Based off of records, the existing street, water main and sanitary sewer systems were installed in the 1930s, and are deteriorating and in need of repair. The road section shows a bituminous surface of 25-feet with no curb and gutter. There is no sidewalk in this area.

Suggested improvements include complete reconstruction including replacement of all pavement, sanitary sewer, water main, storm drains where needed, branch services to each lot, concrete ribbon curb and driveways as applicable. These improvements were determined through a review and evaluation of city infrastructure and an extensive public engagement process.

Latest project update

Thursday, May 13, 2021
As of Thursday, May 13 mainline utilities have been installed on 5th Avenue (between Spruce Street and the private road).  Storm drain is currently being installed on Maxfield Street (between 4th and 5th avenues). Expect storm drain work to continue on Maxfield Street; and sewer and water service work to commence on 5th Ave. the week of May 17.  
More updates

Project documents

No documents at this time.

rss

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer