Rosewood Pond Outlet Improvements

Print
Press Enter to show all options, press Tab go to next option
Lowering the primary weir elevation, expanding outlet capacity, and replacing the existing emergency overflow.

Latest project update

Thursday, November 19, 2026

     Final lift of bituminous is complete.  Rip rap has been installed on the pond side of overflow pipe.  Sod has been installed on 11-18 and the road signs have been pulled making the road open traffic. 

     Upcoming work includes sod care.